INDUSTRIAL BUILD COMPLETE
Exeter 39
This spec industrial building consists of 191,000 SF of tilt-up warehouse space, equipped with 2,291 SF of spec office space, a breakroom, and large open meeting space. The project features a large truck court with auto-operated gates at each end, a diesel fueled fire pump, and 36 overhead sectional doors; 2 of which are oversized for easier access into warehouse spaces.
Additionally, the scope of work included 8 pit-style dock levelers; all of which were fitted with edge of dock bumpers for wall protection.
CONCRETE NIGHT POUR
Join the Wespac team for a
CONCRETE NIGHT POUR
Did you know we often pour concrete at night? 94 trucks poured 934 yards of concrete over 7 hours, for just ONE of 4 slabs in the Exeter's Spec building project.
When concrete cures at high temperatures it has a high rate of evaporation, causing unwanted blemishes and cracks, so night is preferable because the temperature is descending. In addition, concrete workers can avoid daytime high temperatures while working on a surface that is exuding heat itself. Lastly, concrete should be put in place within 90 minutes of loading the truck. Depending on the proximity to the jobsite, this can be a big challenge. Night pouring offers a major advantage, no traffic jams!